top of page


Repair Work of Bitumen Tanks in Bitumen Storage Facilities of Highways 7 (Samsun) Regional Directorate
Start Date: 13.06.2024
Client
Client Name
End Date: 31.12.2024
Samsun Port / SAMSUN
SF, USA
Share
Within the scope of construction work, the following manufacturing was carried out.
-
1 Unit 1000 Ton Bitumen Tank Cleaning / Replacement of All Pipe Systems
-
1 Unit 2000 Ton Bitumen Tank Cleaning / Replacement of All Pipe Systems
-
1 Unit Natural Gas Boiler Supply, Installation and Commissioning Heat Exchanger Manufacturing and Installation of the Renovated Tanks