Repair Work of Bitumen Tanks in Bitumen Storage Facilities of Highways 7 (Samsun) Regional Directorate

Start Date: 13.06.2024

Client

Client Name

End Date: 31.12.2024

Samsun Port / SAMSUN

SF, USA

Share

Within the scope of construction work, the following manufacturing was carried out.

  • 1 Unit 1000 Ton Bitumen Tank Cleaning / Replacement of All Pipe Systems

  • 1 Unit 2000 Ton Bitumen Tank Cleaning / Replacement of All Pipe Systems

  • 1 Unit Natural Gas Boiler Supply, Installation and Commissioning Heat Exchanger Manufacturing and Installation of the Renovated Tanks