SAMSUN HIGHWAYS 7TH REGION BITUMEN TANKS REPAIR

Within the scope of the construction work, maintenance and repairs of bitumen tanks and mechanical systems in the bitumen storage facilities affiliated to the Highways 7 (Samsun) Regional Directorate were carried out.

WhatsApp Görsel 2025-01-15 saat 14.46.27_6c21e5fc.jpg

BİGADİÇ 2-4 mm GRANULAR FERTILIZER PRODUCTION FACILITY

Within the scope of construction work, a Granular Fertilizer Production Facility with a capacity of 20,000 tons/year was built.

BGG GENEL 3D GÖRÜNTÜ.png

BİGADİÇ GRANULAR FERTILIZER FACILITY IMPLEMENTATION PROJECT

All equipment selection and placement works within the scope of ETİ Bigadiç Granular Fertilizer Facility Construction Work were carried out.

DENİZLİ GENEL -1.jpg

DENIZLI KUMKISIK 3rd LOT SOLID WASTE STORAGE CONSTRUCTION

Within the scope of the construction work, a solid waste storage area of ​​52,000 m2 was built.

PHOTO-2020-11-23-15-01-40 2.jpg

KIRKA SOLID WASTE TRANSMISSION SYSTEM CONSTRUCTION

The clay wastes from the ETİ Kırka Boron Operations Directorate Boron factories were transferred to the new waste pond.

gölet ayd 1.jpg

KIRKA WASTE DAM ILLUMINATION AND PROTECTION CONSTRUCTION WORK

Within the scope of the construction work, the security of the new waste pond belonging to ETİ Kırka Boron Operation Directorate was ensured.

Yumuşatma Beton

KIRKA SITE GRADING

Approximately 5,500 m2 of field concrete was manufactured in the activity area of ​​ETİ Kırka Boron Operation Directorate.

WhatsApp Image 2019-11-16 at 11.21.22.jp

NTO POWER SUPPLY

ETİ Beylikova Rare Earth Oxides facility 1st Stage electricity supply has been provided.