Within the scope of the construction work, maintenance and repairs of bitumen tanks and mechanical systems in the bitumen storage facilities affiliated to the Highways 7 (Samsun) Regional Directorate were carried out.
Within the scope of construction work, a Granular Fertilizer Production Facility with a capacity of 20,000 tons/year was built.
All equipment selection and placement works within the scope of ETİ Bigadiç Granular Fertilizer Facility Construction Work were carried out.
Within the scope of the construction work, a solid waste storage area of 52,000 m2 was built.
The clay wastes from the ETİ Kırka Boron Operations Directorate Boron factories were transferred to the new waste pond.
Within the scope of the construction work, the security of the new waste pond belonging to ETİ Kırka Boron Operation Directorate was ensured.
Approximately 5,500 m2 of field concrete was manufactured in the activity area of ETİ Kırka Boron Operation Directorate.
ETİ Beylikova Rare Earth Oxides facility 1st Stage electricity supply has been provided.